top of page
Cleaning Glass Surface

Post-Construction Cleaning

Overview

Construction dust keeps settling for weeks after the crew leaves. It sits on ledges, inside vents and in the fibers of new carpet, and it will keep reappearing until someone removes it properly. Clear Facility Services handles post-construction cleaning for new builds, renovations and tenant build-outs across the Twin Cities.

 

What's Included

  • Debris and packaging removal

  • Dust removal from ceilings, ledges, vents, fixtures and duct covers

  • Adhesive, paint, grout haze and sticker residue taken off glass and fixtures

  • Interior and exterior window cleaning, including tracks and frames

  • Floor treatment matched to the material: sealing, waxing, polishing or extraction

  • Restroom and kitchen fixture detail

  • Final wipe-down before handover

 

How the Phases Work

  • Rough clean: debris cleared during construction so trades can keep working

  • Final clean: full dust removal, glass, fixtures and floors once the work stops

  • Touch-up clean: a last pass right before handover, after settled dust comes down

 

Why the First Floor Treatment Matters

New VCT that never gets sealed, or concrete that gets the wrong product on it, starts its wear cycle already behind. Getting the first treatment right is the cheapest floor work you will ever buy.

How Post-Construction Cleaning Works

Rough Clean

Debris and packaging cleared during construction so trades keep working and the site stays safe.

Final Clean

Full dust removal from ceilings to floors, plus glass, fixtures, residue and floor treatment.

Touch-Up

A last pass right before handover, once the dust stirred up by the final clean has settled.

Floor Finishing

New VCT sealed and waxed, concrete polished, carpet extracted. The first treatment sets the wear cycle.

Get a Post-Construction Quote

Send us the scope and the handover date. We'll walk the site, price the phases you need, and send a quote with no obligation.

bottom of page